60-Ton Lowbed Fleet for Heavy Plant Haulage
A fleet of 3-axle hydraulic-ramp lowbeds engineered to move excavators, dozers and cranes between highway and infrastructure sites.
- Units
- 12
- Payload
- 60 T
- Lead time
- 14 weeks
- Gooseneck and deck reinforced for concentrated track loads
- Hydraulic rear ramps with anti-slip deck plating
- Every unit load-tested before handover